INFRASTRUCTURE



Szolnok Industrial Park provides modern business environment for hungarian and foreign investors.
The Park offers international standard infrastructure network on greenfield sites suitable for all types of occupiers whether their requirements be for manufacturing purposes, distribution or offices.

Available public utilities :

  • Drinking-water network, sewage drainage system
  • Rainwater drainage system
  • Fire-fighting water storage lake
  • Communication ground works
  • Gas supply network
  • Electric energy network ( 20 KV and 0,4 KV network )
  • Public lighting system
  • Internal road network
  • Industrial water and industrial sewage water drainage network
  • Industrial rail-track

Industrial Park can provide the connection possibility to public utilities outside the building site, 2-20 metres from the borderline.

The connection fees to the public utilities are paid by settler companies.


PUBLIC UTILITY CONNECTION FEES IN SZOLNOK


public utility
Fees
Gas:

According to the No. 884/2011. Decree of Hungarian Energy Office:

 
- below 4 m3/hour
 
 ( 44.000 HUF * T3 ) + VAT
- 4-20 m3/hour:
   (44.000 HUF + 9.300 HUF * T1) * T3 + VAT
- above 20 m3/hour:
 (192.800 HUF + 2.800 HUF * T2) * T3 + VAT
Electric energy:

According to the No. 868/2011. Decree of Hungarian Energy Office:

 
- electric supply with 0,4 KV
3.600 HUF / A + VAT
- electric supply with 22 KV
12.600 HUF / kVA + VAT
 

Drinking water and communal sewage water:

according to the tariffs of the water supplier company in szolnok:

 
- Drinking water
270.026 HUF + VAT / m3 / day
- Communal sewage water

411.923 HUF + VAT / m3 / day


Notation:

T1: the surplus capacity above 4 m3/hour in the final construction drawing ( m3/hour )

T2: the surplus capacity above 20 m3/hour in the final construction drawing ( m3/hour )

T3: it’s degree was „1” in 2006 and every year it increases with 0,02

The connection fees to the public utilities are paid by settler companies!